[1]
Keynobi, F., Wirdianto, E. and Zidanne, M. 2025. VRPTW Distribution Route Determination with Rigid and Flexible Time Window and Assignment Based on Number of Demand. Jurnal Sistem Teknik Industri. 27, 1 (Jan. 2025), 14–20. DOI:https://doi.org/10.32734/jsti.v27i1.17230.