[1]
“Collaborative Planning, Forecasting, and Replenishment (CPFR) to Reduce Bullwhip Effect: Case Study”, j.sist.teknik.industri., vol. 25, no. 2, pp. 236–244, Jul. 2023, doi: 10.32734/jsti.v25i2.10601.